CAPA Master

Corrective and preventive actions with root cause, verification and workflow status.

Open CAPAs

20

Closed CAPAs

9

Overdue CAPAs

9

Pending Approvals

10

CAPA No.Linked NCRProblem DescriptionRoot CauseCorrective ActionPreventive ActionResponsibleRaisedDue DateStatusEffectivenessFilesRemarks
CAPA-26-0101NCR-26-0042Hole misalignment on flange couplingFixture locating pin worn beyond limitReplaced locating pins and re-validated fixtureAdded fixture pin to preventive maintenance checklistMahesh Patil01 Mar 202602 Apr 2026
Open
Pending
0
CAPA-26-0102NCR-26-0043Casting porosity found at incoming inspectionSupplier ladle practice deviationSegregated lot and returned to supplierSupplier CAPA raised with quarterly auditKavita Rane02 Apr 202603 May 2026
In Progress
Verified Effective
1
CAPA-26-0103NCR-26-0044Surface finish beyond Ra 0.8 after grindingGrinding wheel dressing interval too longReduced dressing interval to every 200 pcsWheel dressing added to setup approval sheetAnita Deshmukh03 May 202604 Jun 2026
Pending Approval
Under Verification
2
CAPA-26-0104NCR-26-0045Thread gauge rejection at tappingTap wear not tracked against tool lifeScrapped worn taps, introduced tool-life counterTool-life monitoring added to CNC control planNeha Shinde04 Jun 202605 Jul 2026
Closed
Verified Effective
3
CAPA-26-0105NCR-26-0046Heat treatment hardness below 42 HRCFurnace soak time under-set on recipeCorrected furnace recipe and re-treated batchRecipe locked with supervisor passwordPrakash Borse05 Jul 202606 Aug 2026
Overdue
Pending
0Escalated to plant head
CAPA-26-0106NCR-26-0047Bar stock length variation from supplierIncoming inspection sampling plan inadequateIncreased AQL sampling to level IIRevised incoming inspection plan and trained inspectorsMahesh Patil06 Aug 202607 Mar 2026
Open
Verified Effective
1
CAPA-26-0107NCR-26-0048Burr at drilled bore causing assembly issueDeburring station skipped during shift changeReworked affected pieces at deburringPoka-yoke tray added after drilling operationKavita Rane07 Mar 202608 Apr 2026
In Progress
Under Verification
2
CAPA-26-0108NCR-26-0049Plating thickness below specificationBath concentration drift not monitoredRe-plated the affected batch after bath correctionAutomatic bath concentration logging every 2 hoursAnita Deshmukh08 Apr 202609 May 2026
Pending Approval
Not Effective
3
CAPA-26-0109NCR-26-0050Hole misalignment on flange couplingFixture locating pin worn beyond limitReplaced locating pins and re-validated fixtureAdded fixture pin to preventive maintenance checklistNeha Shinde09 May 202610 Jun 2026
Closed
Verified Effective
0
CAPA-26-0110NCR-26-0051Casting porosity found at incoming inspectionSupplier ladle practice deviationSegregated lot and returned to supplierSupplier CAPA raised with quarterly auditPrakash Borse10 Jun 202611 Jul 2026
Overdue
Verified Effective
1Escalated to plant head
CAPA-26-0111NCR-26-0052Surface finish beyond Ra 0.8 after grindingGrinding wheel dressing interval too longReduced dressing interval to every 200 pcsWheel dressing added to setup approval sheetMahesh Patil11 Jul 202612 Aug 2026
Open
Under Verification
2
CAPA-26-0112NCR-26-0053Thread gauge rejection at tappingTap wear not tracked against tool lifeScrapped worn taps, introduced tool-life counterTool-life monitoring added to CNC control planKavita Rane12 Aug 202613 Mar 2026
In Progress
Not Effective
3
CAPA-26-0113NCR-26-0042Heat treatment hardness below 42 HRCFurnace soak time under-set on recipeCorrected furnace recipe and re-treated batchRecipe locked with supervisor passwordAnita Deshmukh13 Mar 202614 Apr 2026
Pending Approval
Pending
0
CAPA-26-0114NCR-26-0043Bar stock length variation from supplierIncoming inspection sampling plan inadequateIncreased AQL sampling to level IIRevised incoming inspection plan and trained inspectorsNeha Shinde14 Apr 202615 May 2026
Closed
Verified Effective
1
CAPA-26-0115NCR-26-0044Burr at drilled bore causing assembly issueDeburring station skipped during shift changeReworked affected pieces at deburringPoka-yoke tray added after drilling operationPrakash Borse15 May 202616 Jun 2026
Overdue
Under Verification
2Escalated to plant head
CAPA-26-0116NCR-26-0045Plating thickness below specificationBath concentration drift not monitoredRe-plated the affected batch after bath correctionAutomatic bath concentration logging every 2 hoursMahesh Patil16 Jun 202617 Jul 2026
Open
Not Effective
3
CAPA-26-0117NCR-26-0046Hole misalignment on flange couplingFixture locating pin worn beyond limitReplaced locating pins and re-validated fixtureAdded fixture pin to preventive maintenance checklistKavita Rane17 Jul 202618 Aug 2026
In Progress
Pending
0
CAPA-26-0118NCR-26-0047Casting porosity found at incoming inspectionSupplier ladle practice deviationSegregated lot and returned to supplierSupplier CAPA raised with quarterly auditAnita Deshmukh18 Aug 202619 Mar 2026
Pending Approval
Verified Effective
1
CAPA-26-0119NCR-26-0048Surface finish beyond Ra 0.8 after grindingGrinding wheel dressing interval too longReduced dressing interval to every 200 pcsWheel dressing added to setup approval sheetNeha Shinde19 Mar 202620 Apr 2026
Closed
Verified Effective
2
CAPA-26-0120NCR-26-0049Thread gauge rejection at tappingTap wear not tracked against tool lifeScrapped worn taps, introduced tool-life counterTool-life monitoring added to CNC control planPrakash Borse20 Apr 202621 May 2026
Overdue
Not Effective
3Escalated to plant head
CAPA-26-0121NCR-26-0050Heat treatment hardness below 42 HRCFurnace soak time under-set on recipeCorrected furnace recipe and re-treated batchRecipe locked with supervisor passwordMahesh Patil21 May 202622 Jun 2026
Open
Pending
0
CAPA-26-0122NCR-26-0051Bar stock length variation from supplierIncoming inspection sampling plan inadequateIncreased AQL sampling to level IIRevised incoming inspection plan and trained inspectorsKavita Rane22 Jun 202623 Jul 2026
In Progress
Verified Effective
1
CAPA-26-0123NCR-26-0052Burr at drilled bore causing assembly issueDeburring station skipped during shift changeReworked affected pieces at deburringPoka-yoke tray added after drilling operationAnita Deshmukh23 Jul 202624 Aug 2026
Pending Approval
Under Verification
2
CAPA-26-0124NCR-26-0053Plating thickness below specificationBath concentration drift not monitoredRe-plated the affected batch after bath correctionAutomatic bath concentration logging every 2 hoursNeha Shinde24 Aug 202625 Mar 2026
Closed
Verified Effective
3
CAPA-26-0125NCR-26-0042Hole misalignment on flange couplingFixture locating pin worn beyond limitReplaced locating pins and re-validated fixtureAdded fixture pin to preventive maintenance checklistPrakash Borse25 Mar 202626 Apr 2026
Overdue
Pending
0Escalated to plant head
Showing 125 of 48 records
Page 1 of 2